Settling Down.
Saved in:
| Title: | Settling Down. |
|---|---|
| Authors: | Swallow, Mark A., Halpern, Jack A., Dickey, Michael J. |
| Source: | Civil Engineering (0885-7024). Aug2002, Vol. 72 Issue 8, p52. 6p. 4 Color Photographs, 1 Map. |
| Subjects: | Hydroelectric power plant design & construction, Civil engineering contracts, Mirant Corp. |
| Geographic Terms: | Florida, United States |
| Abstract: | Details the actions taken by the engineers before construction begins on a power plant that will be located next to a reservoir in southern Florida as of August 2002. Terms of the deal between the local government and the Mirant Corporation; Use of an opencut aggregate mine located west of West Palm Beach; Purpose of the power plant; Problem with preloading. |
| Database: | Engineering Source |
|
Full text is not displayed to guests.
Login for full access.
|
|
| FullText | Text: Availability: 1 |
|---|---|
| Header | DbId: egs DbLabel: Engineering Source An: 7278415 AccessLevel: 6 PubType: Periodical PubTypeId: serialPeriodical PreciseRelevancyScore: 0 |
| IllustrationInfo | |
| Items | – Name: Title Label: Title Group: Ti Data: Settling Down. – Name: Author Label: Authors Group: Au Data: <searchLink fieldCode="AR" term="%22Swallow%2C+Mark+A%2E%22">Swallow, Mark A.</searchLink><br /><searchLink fieldCode="AR" term="%22Halpern%2C+Jack+A%2E%22">Halpern, Jack A.</searchLink><br /><searchLink fieldCode="AR" term="%22Dickey%2C+Michael+J%2E%22">Dickey, Michael J.</searchLink> – Name: TitleSource Label: Source Group: Src Data: <searchLink fieldCode="JN" term="%22Civil+Engineering+%280885-7024%29%22">Civil Engineering (0885-7024)</searchLink>. Aug2002, Vol. 72 Issue 8, p52. 6p. 4 Color Photographs, 1 Map. – Name: Subject Label: Subjects Group: Su Data: <searchLink fieldCode="DE" term="%22Hydroelectric+power+plant+design+%26+construction%22">Hydroelectric power plant design & construction</searchLink><br /><searchLink fieldCode="DE" term="%22Civil+engineering+contracts%22">Civil engineering contracts</searchLink><br /><searchLink fieldCode="DE" term="%22Mirant+Corp%2E%22">Mirant Corp.</searchLink> – Name: SubjectGeographic Label: Geographic Terms Group: Su Data: <searchLink fieldCode="DE" term="%22Florida%22">Florida</searchLink><br /><searchLink fieldCode="DE" term="%22United+States%22">United States</searchLink> – Name: Abstract Label: Abstract Group: Ab Data: Details the actions taken by the engineers before construction begins on a power plant that will be located next to a reservoir in southern Florida as of August 2002. Terms of the deal between the local government and the Mirant Corporation; Use of an opencut aggregate mine located west of West Palm Beach; Purpose of the power plant; Problem with preloading. |
| PLink | https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=egs&AN=7278415 |
| RecordInfo | BibRecord: BibEntity: Languages: – Code: eng Text: English PhysicalDescription: Pagination: PageCount: 6 StartPage: 52 Subjects: – SubjectFull: Hydroelectric power plant design & construction Type: general – SubjectFull: Civil engineering contracts Type: general – SubjectFull: Mirant Corp. Type: general – SubjectFull: Florida Type: general – SubjectFull: United States Type: general Titles: – TitleFull: Settling Down. Type: main BibRelationships: HasContributorRelationships: – PersonEntity: Name: NameFull: Swallow, Mark A. – PersonEntity: Name: NameFull: Halpern, Jack A. – PersonEntity: Name: NameFull: Dickey, Michael J. IsPartOfRelationships: – BibEntity: Dates: – D: 01 M: 08 Text: Aug2002 Type: published Y: 2002 Identifiers: – Type: issn-print Value: 08857024 Numbering: – Type: volume Value: 72 – Type: issue Value: 8 Titles: – TitleFull: Civil Engineering (0885-7024) Type: main |
| ResultId | 1 |