Status of construction and first tests of the CLEO III RICH.

Saved in:
Bibliographic Details
Title: Status of construction and first tests of the CLEO III RICH.
Authors: Artuso, M., Azfar, F., Efimov, A., Kopp, S., Mountain, R., Schuh, S., Skwarnicki, T., Stone, S., Viehhauser, G., Anderson, S., Smith, A., Kubota, Y., Lipeles, E., Coan, T., Staeck, J., Fadeyev, V., Volobouev, I., Ye, J.
Source: IEEE Transactions on Nuclear Science. Jun98 Part 1 of 4, Vol. 45 Issue 3, p643. 5p. 6 Diagrams, 10 Graphs.
Subjects: Detectors, Cleo Inc.
Abstract: States that CLEO collaboration is planning to upgrade its detector to include a RICH detector for particle identification. Uses of Lithium Fluoride (LiF) crystals radiators; Details on the detector upgrade; Design of the upgraded detector; Operation of the detector.
Database: Engineering Source
Description
Abstract:States that CLEO collaboration is planning to upgrade its detector to include a RICH detector for particle identification. Uses of Lithium Fluoride (LiF) crystals radiators; Details on the detector upgrade; Design of the upgraded detector; Operation of the detector.
ISSN:00189499
DOI:10.1109/23.682470