From product documentation to a ‘method prototype’ and standard times: a new technique for complex manual assembly.
Saved in:
| Title: | From product documentation to a ‘method prototype’ and standard times: a new technique for complex manual assembly. |
|---|---|
| Authors: | Singer, Gonen1 (AUTHOR), Golan, Maya1 (AUTHOR), Cohen, Yuval1,2 (AUTHOR) yuvalco@openu.ac.il |
| Source: | International Journal of Production Research. Jan2014, Vol. 52 Issue 2, p507-520. 14p. 5 Diagrams, 6 Charts. |
| Subjects: | Documentation, New product development, Production planning, Bill of materials, Manufacturing process management, Industrial productivity |
| Abstract: | This paper suggests a new technique to facilitate consistent transition between planning and production stages of small lots of complex products (in quantities that do not justify full automation). Despite the usage of modern approaches such as design for assembly and design for manufacturing the typical product planning ends up before production planning begins, instead of having a unified seamless planning process. This paper presents a new three stage technique to fill the gap between product planning and production. The paper shows how to generate a rigorous production plan by: (1) extending the Bill-of-Materials to include additional required information, (2) constructing an assembly ‘method prototype’ and (3) using the ‘method prototype’ to calculate time standards for executing the assembly. A case study illustrates the proposed technique. [ABSTRACT FROM PUBLISHER] |
| Copyright of International Journal of Production Research is the property of Taylor & Francis Ltd and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.) | |
| Database: | Engineering Source |
|
Full text is not displayed to guests.
Login for full access.
|
|
| Abstract: | This paper suggests a new technique to facilitate consistent transition between planning and production stages of small lots of complex products (in quantities that do not justify full automation). Despite the usage of modern approaches such as design for assembly and design for manufacturing the typical product planning ends up before production planning begins, instead of having a unified seamless planning process. This paper presents a new three stage technique to fill the gap between product planning and production. The paper shows how to generate a rigorous production plan by: (1) extending the Bill-of-Materials to include additional required information, (2) constructing an assembly ‘method prototype’ and (3) using the ‘method prototype’ to calculate time standards for executing the assembly. A case study illustrates the proposed technique. [ABSTRACT FROM PUBLISHER] |
|---|---|
| ISSN: | 00207543 |
| DOI: | 10.1080/00207543.2013.836613 |