From product documentation to a ‘method prototype’ and standard times: a new technique for complex manual assembly.
Saved in:
| Title: | From product documentation to a ‘method prototype’ and standard times: a new technique for complex manual assembly. |
|---|---|
| Authors: | Singer, Gonen1 (AUTHOR), Golan, Maya1 (AUTHOR), Cohen, Yuval1,2 (AUTHOR) yuvalco@openu.ac.il |
| Source: | International Journal of Production Research. Jan2014, Vol. 52 Issue 2, p507-520. 14p. 5 Diagrams, 6 Charts. |
| Subjects: | Documentation, New product development, Production planning, Bill of materials, Manufacturing process management, Industrial productivity |
| Abstract: | This paper suggests a new technique to facilitate consistent transition between planning and production stages of small lots of complex products (in quantities that do not justify full automation). Despite the usage of modern approaches such as design for assembly and design for manufacturing the typical product planning ends up before production planning begins, instead of having a unified seamless planning process. This paper presents a new three stage technique to fill the gap between product planning and production. The paper shows how to generate a rigorous production plan by: (1) extending the Bill-of-Materials to include additional required information, (2) constructing an assembly ‘method prototype’ and (3) using the ‘method prototype’ to calculate time standards for executing the assembly. A case study illustrates the proposed technique. [ABSTRACT FROM PUBLISHER] |
| Copyright of International Journal of Production Research is the property of Taylor & Francis Ltd and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.) | |
| Database: | Engineering Source |
|
Full text is not displayed to guests.
Login for full access.
|
|
| FullText | Links: – Type: pdflink Text: Availability: 1 |
|---|---|
| Header | DbId: egs DbLabel: Engineering Source An: 93623478 AccessLevel: 6 PubType: Academic Journal PubTypeId: academicJournal PreciseRelevancyScore: 0 |
| IllustrationInfo | |
| Items | – Name: Title Label: Title Group: Ti Data: From product documentation to a ‘method prototype’ and standard times: a new technique for complex manual assembly. – Name: Author Label: Authors Group: Au Data: <searchLink fieldCode="AR" term="%22Singer%2C+Gonen%22">Singer, Gonen</searchLink><relatesTo>1</relatesTo> (AUTHOR)<br /><searchLink fieldCode="AR" term="%22Golan%2C+Maya%22">Golan, Maya</searchLink><relatesTo>1</relatesTo> (AUTHOR)<br /><searchLink fieldCode="AR" term="%22Cohen%2C+Yuval%22">Cohen, Yuval</searchLink><relatesTo>1,2</relatesTo> (AUTHOR)<i> yuvalco@openu.ac.il</i> – Name: TitleSource Label: Source Group: Src Data: <searchLink fieldCode="JN" term="%22International+Journal+of+Production+Research%22">International Journal of Production Research</searchLink>. Jan2014, Vol. 52 Issue 2, p507-520. 14p. 5 Diagrams, 6 Charts. – Name: Subject Label: Subjects Group: Su Data: <searchLink fieldCode="DE" term="%22Documentation%22">Documentation</searchLink><br /><searchLink fieldCode="DE" term="%22New+product+development%22">New product development</searchLink><br /><searchLink fieldCode="DE" term="%22Production+planning%22">Production planning</searchLink><br /><searchLink fieldCode="DE" term="%22Bill+of+materials%22">Bill of materials</searchLink><br /><searchLink fieldCode="DE" term="%22Manufacturing+process+management%22">Manufacturing process management</searchLink><br /><searchLink fieldCode="DE" term="%22Industrial+productivity%22">Industrial productivity</searchLink> – Name: Abstract Label: Abstract Group: Ab Data: This paper suggests a new technique to facilitate consistent transition between planning and production stages of small lots of complex products (in quantities that do not justify full automation). Despite the usage of modern approaches such as design for assembly and design for manufacturing the typical product planning ends up before production planning begins, instead of having a unified seamless planning process. This paper presents a new three stage technique to fill the gap between product planning and production. The paper shows how to generate a rigorous production plan by: (1) extending the Bill-of-Materials to include additional required information, (2) constructing an assembly ‘method prototype’ and (3) using the ‘method prototype’ to calculate time standards for executing the assembly. A case study illustrates the proposed technique. [ABSTRACT FROM PUBLISHER] – Name: AbstractSuppliedCopyright Label: Group: Ab Data: <i>Copyright of International Journal of Production Research is the property of Taylor & Francis Ltd and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract.</i> (Copyright applies to all Abstracts.) |
| PLink | https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=egs&AN=93623478 |
| RecordInfo | BibRecord: BibEntity: Identifiers: – Type: doi Value: 10.1080/00207543.2013.836613 Languages: – Code: eng Text: English PhysicalDescription: Pagination: PageCount: 14 StartPage: 507 Subjects: – SubjectFull: Documentation Type: general – SubjectFull: New product development Type: general – SubjectFull: Production planning Type: general – SubjectFull: Bill of materials Type: general – SubjectFull: Manufacturing process management Type: general – SubjectFull: Industrial productivity Type: general Titles: – TitleFull: From product documentation to a ‘method prototype’ and standard times: a new technique for complex manual assembly. Type: main BibRelationships: HasContributorRelationships: – PersonEntity: Name: NameFull: Singer, Gonen – PersonEntity: Name: NameFull: Golan, Maya – PersonEntity: Name: NameFull: Cohen, Yuval IsPartOfRelationships: – BibEntity: Dates: – D: 15 M: 01 Text: Jan2014 Type: published Y: 2014 Identifiers: – Type: issn-print Value: 00207543 Numbering: – Type: volume Value: 52 – Type: issue Value: 2 Titles: – TitleFull: International Journal of Production Research Type: main |
| ResultId | 1 |