Ocensa's pumps key to meeting production goals.
Saved in:
| Title: | Ocensa's pumps key to meeting production goals. |
|---|---|
| Source: | Oil & Gas Journal. 07/28/97, Vol. 95 Issue 30, p71. 2p. 2 Color Photographs. |
| Subject Terms: | *Petroleum pipelines |
| Geographic Terms: | Colombia |
| Company/Entity: | Oleoducto Central SA |
| Abstract: | Focuses on Oleoducto Central SA's oil pipeline project in Colombia. Installation of several engine-driven centrifugal pump packages; Design of the pump packages; Analysis of the engines' performance. |
| Database: | Energy & Power Source |
| Abstract: | Focuses on Oleoducto Central SA's oil pipeline project in Colombia. Installation of several engine-driven centrifugal pump packages; Design of the pump packages; Analysis of the engines' performance. |
|---|---|
| ISSN: | 00301388 |