Specifications for the First CSP Building System.

Saved in:
Bibliographic Details
Title: Specifications for the First CSP Building System.
Authors: Detroit Public Schools, MI.
Peer Reviewed: N
Page Count: 230
Publication Date: 1970
Sponsoring Agency: Detroit Board of Education, MI.
Educational Facilities Labs., Inc., New York, NY.
Descriptors: Architects, Bids, Building Systems, Construction Management, Contracts, Controlled Environment, Critical Path Method, Facility Planning, Facility Requirements, Fast Track Scheduling, Legal Responsibility, Lighting, School Construction, Specifications, Structural Building Systems, Structural Elements (Construction), Systems Approach
Abstract: The specifications cover the construction of additions to four schools in the Detroit School District. The Construction Systems Program (CSP) was utilized in an attempt to (1) reduce the cost of school construction and provide improved value for the building dollar in terms of function, environment, first cost, and maintenance cost; (2) accelerate construction time; and (3) provide the occupants greater flexibility to better meet educational needs. This document is arranged according to the information for bidders; the contract requirements; and the specifications for the sub-systems of structure, atmosphere, lighting-ceiling, interior space division, and vertical skin. Addendums cover scheduling requirements, fire protection interpretations, and specification clarifications. Terms are defined; owner, contractor, and architect responsibilities are outlined; and proposal forms are supplied. (Pages II-1-8 and II-2-2 may reproduce poorly.) (Author/MLF)
Entry Date: 1973
Accession Number: ED070202
Database: ERIC
FullText Text:
  Availability: 0
CustomLinks:
  – Url: https://eric.ed.gov/contentdelivery/servlet/ERICServlet?accno=ED070202
    Name: ERIC Full Text
    Category: fullText
    Text: Full Text from ERIC
Header DbId: eric
DbLabel: ERIC
An: ED070202
AccessLevel: 3
PubTypeId: unknown
PreciseRelevancyScore: 0
IllustrationInfo
Items – Name: Title
  Label: Title
  Group: Ti
  Data: Specifications for the First CSP Building System.
– Name: Author
  Label: Authors
  Group: Au
  Data: <searchLink fieldCode="AR" term="%22Detroit+Public+Schools%2C+MI%2E%22">Detroit Public Schools, MI.</searchLink>
– Name: PeerReviewed
  Label: Peer Reviewed
  Group: SrcInfo
  Data: N
– Name: Pages
  Label: Page Count
  Group: Src
  Data: 230
– Name: DatePubCY
  Label: Publication Date
  Group: Date
  Data: 1970
– Name: SourceSuprt
  Label: Sponsoring Agency
  Group: SrcSuprt
  Data: Detroit Board of Education, MI.<br />Educational Facilities Labs., Inc., New York, NY.
– Name: Subject
  Label: Descriptors
  Group: Su
  Data: <searchLink fieldCode="DE" term="%22Architects%22">Architects</searchLink><br /><searchLink fieldCode="DE" term="%22Bids%22">Bids</searchLink><br /><searchLink fieldCode="DE" term="%22Building+Systems%22">Building Systems</searchLink><br /><searchLink fieldCode="DE" term="%22Construction+Management%22">Construction Management</searchLink><br /><searchLink fieldCode="DE" term="%22Contracts%22">Contracts</searchLink><br /><searchLink fieldCode="DE" term="%22Controlled+Environment%22">Controlled Environment</searchLink><br /><searchLink fieldCode="DE" term="%22Critical+Path+Method%22">Critical Path Method</searchLink><br /><searchLink fieldCode="DE" term="%22Facility+Planning%22">Facility Planning</searchLink><br /><searchLink fieldCode="DE" term="%22Facility+Requirements%22">Facility Requirements</searchLink><br /><searchLink fieldCode="DE" term="%22Fast+Track+Scheduling%22">Fast Track Scheduling</searchLink><br /><searchLink fieldCode="DE" term="%22Legal+Responsibility%22">Legal Responsibility</searchLink><br /><searchLink fieldCode="DE" term="%22Lighting%22">Lighting</searchLink><br /><searchLink fieldCode="DE" term="%22School+Construction%22">School Construction</searchLink><br /><searchLink fieldCode="DE" term="%22Specifications%22">Specifications</searchLink><br /><searchLink fieldCode="DE" term="%22Structural+Building+Systems%22">Structural Building Systems</searchLink><br /><searchLink fieldCode="DE" term="%22Structural+Elements+%28Construction%29%22">Structural Elements (Construction)</searchLink><br /><searchLink fieldCode="DE" term="%22Systems+Approach%22">Systems Approach</searchLink>
– Name: Abstract
  Label: Abstract
  Group: Ab
  Data: The specifications cover the construction of additions to four schools in the Detroit School District. The Construction Systems Program (CSP) was utilized in an attempt to (1) reduce the cost of school construction and provide improved value for the building dollar in terms of function, environment, first cost, and maintenance cost; (2) accelerate construction time; and (3) provide the occupants greater flexibility to better meet educational needs. This document is arranged according to the information for bidders; the contract requirements; and the specifications for the sub-systems of structure, atmosphere, lighting-ceiling, interior space division, and vertical skin. Addendums cover scheduling requirements, fire protection interpretations, and specification clarifications. Terms are defined; owner, contractor, and architect responsibilities are outlined; and proposal forms are supplied. (Pages II-1-8 and II-2-2 may reproduce poorly.) (Author/MLF)
– Name: DateEntry
  Label: Entry Date
  Group: Date
  Data: 1973
– Name: AN
  Label: Accession Number
  Group: ID
  Data: ED070202
PLink https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=eric&AN=ED070202
RecordInfo BibRecord:
  BibEntity:
    PhysicalDescription:
      Pagination:
        PageCount: 230
    Subjects:
      – SubjectFull: Architects
        Type: general
      – SubjectFull: Bids
        Type: general
      – SubjectFull: Building Systems
        Type: general
      – SubjectFull: Construction Management
        Type: general
      – SubjectFull: Contracts
        Type: general
      – SubjectFull: Controlled Environment
        Type: general
      – SubjectFull: Critical Path Method
        Type: general
      – SubjectFull: Facility Planning
        Type: general
      – SubjectFull: Facility Requirements
        Type: general
      – SubjectFull: Fast Track Scheduling
        Type: general
      – SubjectFull: Legal Responsibility
        Type: general
      – SubjectFull: Lighting
        Type: general
      – SubjectFull: School Construction
        Type: general
      – SubjectFull: Specifications
        Type: general
      – SubjectFull: Structural Building Systems
        Type: general
      – SubjectFull: Structural Elements (Construction)
        Type: general
      – SubjectFull: Systems Approach
        Type: general
    Titles:
      – TitleFull: Specifications for the First CSP Building System.
        Type: main
  BibRelationships:
    HasContributorRelationships:
      – PersonEntity:
          Name:
            NameFull: Detroit Public Schools, MI.
    IsPartOfRelationships:
      – BibEntity:
          Dates:
            – D: 16
              M: 11
              Type: published
              Y: 1970
ResultId 1