Construction Management.
Saved in:
| Title: | Construction Management. |
|---|---|
| Authors: | Abbott, James F., Society for Coll. and Univ. Planning, New York, NY. |
| Peer Reviewed: | N |
| Page Count: | 4 |
| Publication Date: | 1971 |
| Report Number: | SCUP Journal v2 n3 pp1-4 Dec 1971 |
| Descriptors: | Architects, Architectural Programing, Bids, College Planning, Construction Costs, Construction Management, Construction Programs, Cost Effectiveness, Educational Specifications, Facility Planning, Fast Track Scheduling, Performance Specifications |
| Abstract: | This article provides a detailed discussion of a team approach to building that involves a construction manager, an architect, and a contractor. Bidding methods are outlined; the major components in construction management -- value engineering and fast track scheduling -- and the use of performance specifications are discussed. The construction manager's role is summarized, and a detailed list of the services offered by the author's construction management firm is presented. (MLF) |
| Journal Code: | RIEMAY1973 |
| Entry Date: | 1973 |
| Accession Number: | ED071198 |
| Database: | ERIC |
| Abstract: | This article provides a detailed discussion of a team approach to building that involves a construction manager, an architect, and a contractor. Bidding methods are outlined; the major components in construction management -- value engineering and fast track scheduling -- and the use of performance specifications are discussed. The construction manager's role is summarized, and a detailed list of the services offered by the author's construction management firm is presented. (MLF) |
|---|