Construction Management, in a Miami Test, Saves $1.5 Million

Saved in:
Bibliographic Details
Title: Construction Management, in a Miami Test, Saves $1.5 Million
Source: Architectural Record. Jan 77 161(1):75-78.
Peer Reviewed: N
Page Count: 4
Publication Date: 1977
Descriptors: Building Innovation, Construction Costs, Construction Management, Construction Materials, Cost Effectiveness, Fast Track Scheduling, Secondary Education
Abstract: In direct comparison with a high school built according to traditional design and contracting, a new prototype for the Dade County School District resulted in substantial savings without sacrificing quality. Available from: McGraw Hill Inc., 1221 Avenue of the Americas, New York, New York 10020, $5.00 single copy. (Author)
Entry Date: 1977
Accession Number: EJ151333
Database: ERIC
FullText Text:
  Availability: 0
Header DbId: eric
DbLabel: ERIC
An: EJ151333
AccessLevel: 3
PubTypeId: unknown
PreciseRelevancyScore: 0
IllustrationInfo
Items – Name: Title
  Label: Title
  Group: Ti
  Data: Construction Management, in a Miami Test, Saves $1.5 Million
– Name: TitleSource
  Label: Source
  Group: Src
  Data: <searchLink fieldCode="SO" term="%22Architectural+Record%22"><i>Architectural Record</i></searchLink>. Jan 77 161(1):75-78.
– Name: PeerReviewed
  Label: Peer Reviewed
  Group: SrcInfo
  Data: N
– Name: Pages
  Label: Page Count
  Group: Src
  Data: 4
– Name: DatePubCY
  Label: Publication Date
  Group: Date
  Data: 1977
– Name: Subject
  Label: Descriptors
  Group: Su
  Data: <searchLink fieldCode="DE" term="%22Building+Innovation%22">Building Innovation</searchLink><br /><searchLink fieldCode="DE" term="%22Construction+Costs%22">Construction Costs</searchLink><br /><searchLink fieldCode="DE" term="%22Construction+Management%22">Construction Management</searchLink><br /><searchLink fieldCode="DE" term="%22Construction+Materials%22">Construction Materials</searchLink><br /><searchLink fieldCode="DE" term="%22Cost+Effectiveness%22">Cost Effectiveness</searchLink><br /><searchLink fieldCode="DE" term="%22Fast+Track+Scheduling%22">Fast Track Scheduling</searchLink><br /><searchLink fieldCode="DE" term="%22Secondary+Education%22">Secondary Education</searchLink>
– Name: Abstract
  Label: Abstract
  Group: Ab
  Data: In direct comparison with a high school built according to traditional design and contracting, a new prototype for the Dade County School District resulted in substantial savings without sacrificing quality. Available from: McGraw Hill Inc., 1221 Avenue of the Americas, New York, New York 10020, $5.00 single copy. (Author)
– Name: DateEntry
  Label: Entry Date
  Group: Date
  Data: 1977
– Name: AN
  Label: Accession Number
  Group: ID
  Data: EJ151333
PLink https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=eric&AN=EJ151333
RecordInfo BibRecord:
  BibEntity:
    PhysicalDescription:
      Pagination:
        PageCount: 4
        StartPage: 75
    Subjects:
      – SubjectFull: Building Innovation
        Type: general
      – SubjectFull: Construction Costs
        Type: general
      – SubjectFull: Construction Management
        Type: general
      – SubjectFull: Construction Materials
        Type: general
      – SubjectFull: Cost Effectiveness
        Type: general
      – SubjectFull: Fast Track Scheduling
        Type: general
      – SubjectFull: Secondary Education
        Type: general
    Titles:
      – TitleFull: Construction Management, in a Miami Test, Saves $1.5 Million
        Type: main
  BibRelationships:
    IsPartOfRelationships:
      – BibEntity:
          Dates:
            – D: 01
              M: 01
              Type: published
              Y: 1977
          Numbering:
            – Type: volume
              Value: 161
            – Type: issue
              Value: 1
ResultId 1