Bridging Spans the Gaps in Project Delivery.
Saved in:
| Title: | Bridging Spans the Gaps in Project Delivery. |
|---|---|
| Language: | English |
| Authors: | Heery, George T. |
| Source: | College Planning & Management. Nov 2002 5(11):20-23. |
| Peer Reviewed: | N |
| Page Count: | 4 |
| Publication Date: | 2002 |
| Document Type: | Guides - Non-Classroom Journal Articles |
| Descriptors: | Construction Management, Design Build Approach, Educational Facilities Planning, School Construction |
| ISSN: | 1523-0910 |
| Abstract: | Discusses the advantages of "bridging," a hybrid project delivery approach that uses an owner's design architect and program manager to prepare preliminary design and specification documents, and then has this team closely supervise the contractor's architect and engineers in finalizing the construction documents. (EV) |
| Journal Code: | CIJJUN2003 |
| Entry Date: | 2003 |
| Accession Number: | EJ661074 |
| Database: | ERIC |
| FullText | Text: Availability: 0 |
|---|---|
| Header | DbId: eric DbLabel: ERIC An: EJ661074 AccessLevel: 3 PubType: Electronic Resource PubTypeId: electronicResource PreciseRelevancyScore: 0 |
| IllustrationInfo | |
| Items | – Name: Title Label: Title Group: Ti Data: Bridging Spans the Gaps in Project Delivery. – Name: Language Label: Language Group: Lang Data: English – Name: Author Label: Authors Group: Au Data: <searchLink fieldCode="AR" term="%22Heery%2C+George+T%2E%22">Heery, George T.</searchLink> – Name: TitleSource Label: Source Group: Src Data: <searchLink fieldCode="SO" term="%22College+Planning+%26+Management%22"><i>College Planning & Management</i></searchLink>. Nov 2002 5(11):20-23. – Name: PeerReviewed Label: Peer Reviewed Group: SrcInfo Data: N – Name: Pages Label: Page Count Group: Src Data: 4 – Name: DatePubCY Label: Publication Date Group: Date Data: 2002 – Name: TypeDocument Label: Document Type Group: TypDoc Data: Guides - Non-Classroom<br />Journal Articles – Name: Subject Label: Descriptors Group: Su Data: <searchLink fieldCode="DE" term="%22Construction+Management%22">Construction Management</searchLink><br /><searchLink fieldCode="DE" term="%22Design+Build+Approach%22">Design Build Approach</searchLink><br /><searchLink fieldCode="DE" term="%22Educational+Facilities+Planning%22">Educational Facilities Planning</searchLink><br /><searchLink fieldCode="DE" term="%22School+Construction%22">School Construction</searchLink> – Name: ISSN Label: ISSN Group: ISSN Data: 1523-0910 – Name: Abstract Label: Abstract Group: Ab Data: Discusses the advantages of "bridging," a hybrid project delivery approach that uses an owner's design architect and program manager to prepare preliminary design and specification documents, and then has this team closely supervise the contractor's architect and engineers in finalizing the construction documents. (EV) – Name: CodeSource Label: Journal Code Group: SrcInfo Data: <searchLink fieldCode="JC" term="%22CIJJUN2003%22">CIJJUN2003</searchLink> – Name: DateEntry Label: Entry Date Group: Date Data: 2003 – Name: AN Label: Accession Number Group: ID Data: EJ661074 |
| PLink | https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=eric&AN=EJ661074 |
| RecordInfo | BibRecord: BibEntity: Languages: – Text: English PhysicalDescription: Pagination: PageCount: 4 StartPage: 20 Subjects: – SubjectFull: Construction Management Type: general – SubjectFull: Design Build Approach Type: general – SubjectFull: Educational Facilities Planning Type: general – SubjectFull: School Construction Type: general Titles: – TitleFull: Bridging Spans the Gaps in Project Delivery. Type: main BibRelationships: HasContributorRelationships: – PersonEntity: Name: NameFull: Heery, George T. IsPartOfRelationships: – BibEntity: Dates: – D: 01 M: 01 Type: published Y: 2002 Identifiers: – Type: issn-print Value: 1523-0910 Numbering: – Type: volume Value: 5 – Type: issue Value: 11 Titles: – TitleFull: College Planning & Management Type: main |
| ResultId | 1 |